Soprabolzano (BZ)

Relamping for Parkhotel Holzner

Challenge

Intervention of relamping with reduction and replacement of 253 light bodies with low consumption LED technology and the possibility of adjusting the light intensity through an intelligent management system.
 

Solution

The intervention made it possible to significantly reduce electricity consumption for lighting, which before the intervention amounted to 54,820 kWh / year. Thanks to the technological upgrade and the introduction of a control and management system, the Hotel Holzner was able to save energy and corresponding CO2 emissions up to 85%.

Location


Soprabolzano (BZ)
Client

Parkhotel Holzner

Type of building

Relamping

Realisation
We are here for you!
inewa

A. Volta Straße 13/A, 39100 Bolzano-Bozen

Phone: +39 0471 1957078

Mail: info(at)inewa.it

inewa